Singapore LNG Corporation Pte Ltd

SLNG - Singapore LNG Corporation Pte Ltd

Singapore LNG Corporation Pte Ltd (SLNG) operates Singapore's first LNG (Liquefied Natural Gas) Terminal on Jurong Island. It was incorporated by the Energy Market Authority back in June 2009 to develop, build, own and operate Singapore’s, and Asia’s very first open access, multi-user LNG Terminal . 

Operational since May 2013, the Terminal has an initial throughput capacity of 3.5 million tonnes per annum (Mtpa) with two 180,000 cubic metres LNG Storage Tanks and a primary jetty with a cargo capacity of 120,000 to 265,000 cubic metres. This capacity will increase to approximately 6 Mtpa by the end of 2013 when a third 180,000 m3 LNG Storage Tank and regasification facilities are added. The LNG Terminal will also feature a secondary berth which comprises a secondary jetty and a tertiary jetty that can cater to a wider range of LNG vessels ranging from 10,000 to 40,000 cubic metres and 60,000 to 265,000 cubic metres respectively. 

SLNG’s core business include LNG terminalling, storage, throughput, reloading and vessel cool down services. Beyond these, SLNG will continuously explore new LNG business opportunities as it pursues its vision to become the Gateway for LNG in Asia, and establish Singapore as the LNG Hub for the region. 

The next phase of expansion of the Terminal (Phase 3), to bring its throughput capacity to 9 Mtpa, has been initiated and the final investment decision, including Construction award, are expected in early Q2 of 2014.

SLNG is looking for highly competent team players with a positive outlook. Top on this list are self-driven people, imbued with a sense of good ethics and high Emotional Quotient (EQ). We promise all who come on board an enriching and rewarding journey.

Business Process Analyst
Location: Jurong IslandRef Code: 1407IT-BPA
The successful candidate will liaise closely with other members of the SLNG business groups to undertake an assessment of their business needs, develop required business process maps and functional specifications, and follow on with procurement and integration of the associated IT applications and systems into the company. He/ She has to quickly develop an in-depth, working knowledge of the range of SLNG business activities, be conversant with IT systems and be able to work with staff and managers across all levels.

Closing date: 15 August 2014 

Commercial AnalystRef Code: 1407CO-CA
The successful candidate will be responsible for managing and scheduling of LNG ships for unloading and changes to nominations and schedules, taking into account scheduled or projected send-out of regasified LNG, use of capacity at the LNG storage tanks and billing. This position will be required to maintain close co-ordination with SLNG’s customers and end users of regasified LNG, and internally, with SLNG’s Operations teams to ensure that SLNG’s obligations to its customers under their commercial agreements are satisfactorily performed. This position will also be required to support other activities within the Commercial Operations function and should be open for a job rotation within the Commercial Operations function.

Closing date: 15 August 2014 

HSSER Supervisor (Fire Safety, Environment & Emergency Response)
Location: Jurong IslandRef Code: 1407CS-FSO
The successful candidate is responsible to the HSSER Manager for acting as the terminal Fire Safety Manager, deputy WSHO and to assist in the HSSER activities being conducted as part of the operation of the LNG terminal. The position, in addition has a day to day reporting line to the Director Operations.

Closing date: 31 July 2014 

Instrument & Control Engineer
Location: Jurong IslandRef Code: 1407OP-ICE
The successful candidate shall provides technical support to the Production, Maintenance and Project teams in the LNG Terminal.  This position is responsible for establishing, reviewing and overseeing the relevant instrument & control design of newly build or modified equipment including implementation of minor instrument and control engineering projects, while ensuring the overall technical integrity of the terminal from the instrument & control discipline perspective.

Closing date: 31 July 2014

Marine Officer
Location: Jurong IslandRef Code: 1407OP-MO
The successful candidate will primarily be responsible for ensuring safe and efficient LNG ship berthing / unberthing and loading/reloading; assist in overseeing maintenance of marine equipments and monitoring the contractors appointed for marine activities; interface internally with Operations and Commercial team, as well as SLNG’s representative onboard ship. 

Closing date: 31 July 2014

Technician (I&E)Ref Code: 1406CO-T[I&E]
The position is part of the maintenance team who oversees safe and effective performance of all instrumentation and electrical maintenance services at the LNG Terminal. The incumbent shall ensure that the equipment and facilities meet required performance standard for operational effectiveness and efficiency.

Closing date: 31 July 2014 

Technician (Production)
Location: Jurong IslandRef Code: 1406CO-TP
The successful candidate is part of the production team who oversees the loading and unloading of LNG cargoes from vessels and the re-gasification process of LNG to piped natural gas to meet nomination requests.

Closing date: 31 July 2014 

Warehouse Operations Executive
Location: Jurong IslandRef Code: 1407CO-WOE
The successful candidate will provide support to the LNG Terminal in the day to day operations of the Warehouse and Inventory, including the receiving, storing and issuing of Inventory; ensuring sufficient stock of spare parts and conducting stock checks and cyclical stock counts as required by SLNG’s policy.


Closing date: 31 July 2014 


No comments:

Post a Comment

Popular Posts

Followers